
Navigating the UK Environmental Permitting Regulations (EPR)
An environmental permit is required under the Environmental Permitting (England and Wales) Regulations 2016. A Permit allows the Operator to carry out various activities that
A CTMP is an important document that will outline all vehicle routing for all potential vehicles that will access and egress the site to test and establish that the local infrastructure can handle the construction traffic and minimise traffic congestion.
A CTMP details traffic routing and site access plans, any restrictions on timing of vehicle movements, i.e. if in a residential area, parking restrictions or suspensions and temporary road closures for access by large or abnormal loads.
Typical inclusions will relate to:-
This document will be used by the principal contractor in preparation for the Construction Logistics Plan (CLP).
WPSCC can compile a CTMP to discharge the Planning condition.
An environmental permit is required under the Environmental Permitting (England and Wales) Regulations 2016. A Permit allows the Operator to carry out various activities that
An environmental permit is required under the Environmental Permitting (England and Wales) Regulations 2016. A Permit allows the Operator to carry out various activities that
Want to keep up to date with all our latest news and information?
Enter your email below to be added to our mailing list.
We use cookies on our site by continuing to browse our site, you agree to the use of these cookies. You can read our cookie policy and learn more here