Case Studies

HG Construction
HG Construction use SitePlan.online to produce their Site Waste Management Plans (SWMPs) and Site Resource Management Plans (SRMPs).

Clearwater
The First Spent Carbon Waste Storage Permit site in the Country, and Our Involvement

Wolverhampton University
Why our MD lectures – Lara is always willing to accommodate work experience requests whenever possible.

DDC Ltd
DDC Ltd originally contacted WPSCC in 2016 because they were struggling to get a Construction Management Plan (CMP) accepted by the Planning Department of a London Borough.

The Myddelton Lodge
The Myddelton Lodge project commenced in December 2015 and was completed in August 2018. The project involved the demolition of some of the outbuildings in the grounds of Myddelton Lodge, refurbishment of the Lodge itself and the construction of a luxury 7* private Lodge.

The Myddelton Lodge Project – S106 Requirements
The Myddelton Lodge project commenced in December 2015 and was completed in August 2018. The project involved the demolition of some of the outbuildings in the grounds of Myddelton Lodge, refurbishment of the Lodge itself and the construction of a luxury 7* private Lodge.

Solihull Community Fire Station
The Solihull Community Fire Station project started in August 2010 and completed in March 2011. It was a refurbishment project to a masonry/brick and block frame construction representing a floor area of approximately 1740m2

EME Installations Ltd Control Room, Reading
The Control Room project, in Reading, started in November 2010 and completed in May 2011. It was a fit out project to the control room of a concrete frame construction representing a floor area of approximately 1250m2.